2019-2020 2020-2021 2021-2022 2022-2023 2023-2024
Browse
by subject...
    Schedule
view...
 

1 - 2 of 2 results for: CEE 241: Managing Fabrication and Construction

CEE 241: Managing Fabrication and Construction

Methods to manage the physical production of construction projects; design, analysis, and optimization of the fabricate-assemble process including performance metrics. Project management techniques and production system design including: push versus pull methods; master scheduling and look-ahead scheduling; scope, cost, and schedule control; earned value analysis; critical path method; location-based scheduling; 4D modeling; workflow; trade coordination; methods to understand uncertainty and reduce process variability; and supply chain systems including made-to-stock, engineered-to-order, and made-to-order. Prerequisite: 100 or consent of instructor. Recommended corequisite: 240.
Terms: Aut | Units: 4
Instructors: Fischer, M. (PI)

CEE 241T: Fundamentals of Managing Fabrication and Construction

Schedule representations including Gantt chart, critical path method (CPM), 4D modeling, and location-based schedules (LBS); activity definition; Product Breakdown Structure (PBS) and Work Breakdown Structure (WBS); consideration of resources constraints, variability, and types of materials in schedule definition; production systems including push, pull, and collaborative systems; project control including earned value analysis (EVA) and plan percent complete (PPC); schedule performance metrics. Class will be held during the first five weeks of Autumn Quarter only.
Terms: Aut | Units: 2
Filter Results:
term offered
updating results...
teaching presence
updating results...
number of units
updating results...
time offered
updating results...
days
updating results...
UG Requirements (GERs)
updating results...
component
updating results...
career
updating results...
© Stanford University | Terms of Use | Copyright Complaints